New Development Information Pre-Construction Development Information I want to: Develop a Residential Subdivision Subdivision Checklist Residential Subdivision Service Request Template Current Residential Fee Information Develop a Multifamily (Rental) Property Multifamily Checklist Multifamily Service Request Template Current Multifamily Fee Information Develop a Commercial or Industrial Development Commercial Checklist Commercial Service Request Template Current Commercial Fee Information Standard Specifications and Design Information LCWSA Standard Specifications and Design Criteria Fats, Oil, and Grease Policy Water & Sewer Notes Signature Block – Final Plat Signature Block – Construction Speak to the Subdivision and Planning Engineer / 256-233-6445 Ext. 101 / amcmurray@lcwsa.com Construction Period Information I want to: Request a Hydrant Meter Contact GIS Department at 256-233-6445 Ext. 119 or email bledgewood@lcwsa.com Fire Hydrant Rental Agreement Close out my development for acceptance: Maintenance Bond/LOC Template (15% of labor and materials for all water and sewer infrastructure installed for a period of 19 months from date of board meeting date) Official Statement Template Dedication Letter Template As-Built & Walkthrough Requirements Have an inspector look at installed items for approval: Contact Dispatch at 256-233-6444 Ext. 128 or email pmoore@lcwsa.com Request Meters: Process for Builders Requesting Meters Contact New Accounts Rep. at 256-233-6444 Ext. 104 or email newaccounts@lcwsa.com